This video’s ArcGIS Pro UI is based on Version 2.8.3.
The latest 2.9 and later release’s UI may look slightly different.
This video guides how to start to prepare the indoor network. Creating the preliminary transitions is the second step to building a network for indoor data. After running the geoprocessing tool, one will need to locate and identify the transitional passages within the building, and enhance geometry lines and their z-height values with the 3D line.
Tips on creating preliminary transitions:
1. Have knowledge on Z-value editings for stairway transitions
2. Verify Preliminiary Pathways data has correct Z-values for each floor
3. If Z-values are incorrect in preliminiary pathways feature class, the preliminary transitions will inherit the incorrect information
4. Verify the end vertexes of transitions feature is snapped to the preliminary pathways line records
To get started with ArcGIS Indoors, follow this Link: http://ow.ly/YZ4950xboJi
For the latest Indoors information in ArcGIS Pro, please visit: http://ow.ly/KrGK50GCBt6
For latest Indoors Web apps information, please visit: http://ow.ly/XzwR50GCBrM
---------------------------------------------------------------------------------------------------
Follow us on Social Media!
Twitter: https://twitter.com/Esri
Facebook: https://facebook.com/EsriGIS
LinkedIn: https://www.linkedin.com/company/esri
Instagram: https://www.instagram.com/esrigram
The Science of Where: http://www.esri.com
- Tags
-